Working on the floor next.
I got the final bottom row of wall tiles put up, and we are now getting the floor tiles down. We are using the small tiles that are 2×2 and mounted on a one foot square piece of mesh. We cut a few of them into strips that are 2 tiles wide and made a border around the shower floor area, and are putting the full size pieces down in a diamond pattern. Ricardo is getting the initial ones lined up correctly for me.



Here is what it should look like when it is all finished.

Next, I need to seal the natural tile floor and wall pieces so the grout does not sink into the tiles when we apply it. Once that is done, we can start the grouting.