Tiling is almost done!!

05.24.2008 | 10:34 am | Bathroom Renovation

We got all the tile on the walls and floor of the shower stall. The remaining floor area should be done soon. We grouted all the shower tile and put the sealer on. Once it is dry, we can install the faucets and shower heads. We will order the glass next week, and once that is installed, we can use the shower!!! Woo Hoo!!!!

We started this project on January 24th. We save a lot of money, but it has been a long time to have the bathroom ripped up. We can finally see the light at the end of the tunnel.